MEP work at Main Camp

Project MEP work at Main Camp
Client Archirodon Construction (Overseas) CO.S.A
Location Al-Faw Grand Port
Date 2013
Description Mechanical, Electrical , Plumbing works at Main Camp

The work of MEP at main camp was to establish the main camp to Archirodon company that resident more than 200 persons. MEP Work including supply & install of electrical system ( L.V. Panels, L.V power cables, ECC earthing cables, lighting cables) & Water system and Septic system Installation.

The first stage was to excavate the foundations of water network system and electrical network by using excavators and providing required manpower’s.

The electrical cables installation done by expert staff and supervised all time by Archirodon representative which was more than satisfied with the work. After finishing the underground jobs , the process of backfilling begin by using graders , bulldozers and compactors.

The concrete bases and concrete pads were done to install the caravans and accommodation units on it. After this the connections of electrical cables to main panels, installing lighting system , installing Ac units was done.